Our Homes
WElink Homes is a full-service developer of high-quality homes for families, designed to combine high-quality architecture and trusted building materials with the quality and certainty afforded by an efficient manufacturing process.
Manufacturing
At WElink Homes, manufacturing excellence is at the heart of our value proposition and we recognise that Modern Methods of Construction (MMC) is not just about moving the building site under a roof. Our manufacturing facility creates an environment where our homes can be manufactured around the clock, regardless of weather conditions and using a highly trained, consistent workforce; but it is the manufactured product itself and the assembly processes used to create it that bring about a more transformational change in the quality and performance of our homes.
All of our homes are created using wall, floor and roof assemblies, with high performing and rigorously tested building materials incorporated with precision to ensure superior standards of quality, performance and durability. What’s more, every component and assembly has been designed for manufacture – in simple terms, we have applied high levels of standardisation to ensure that simple, fail-safe operating procedures can be followed such that every step of the assembly process achieves the quality standard expected.
Supporting the assembly of each home is a suite of data-driven production systems, ensuring high levels of process and quality control and bringing efficiency, repeatability and predictability to a home building process that has traditionally been haphazard and inefficient.
On-site, we view each housing plot as an extension of our factory production line, deploying a standardised and repeatable process to assemble the factory-produced wall, floor and roof components into a weather-tight superstructure for each home.
115,000 ft2
Manufacturing
Facility
High performing
and rigorously
tested building
materials
Data driven
production systems,
ensuring high levels
of process and
quality control
WElink Homes vs Industry Standard
Built using off-site methods improves consistency, quality and the technical performance of our homes.
WElink
Traditional
WElink is much faster (complete by Week 9 as compared to traditional builds are complete by Week 20)
The Process – End-to-End Control
We take a standardised, scalable approach to the design, manufacturing, installation and completion of houses.
Our homes are designed to deliver a complex product with simplicity, ensuring waste is minimised and productivity maximised.
Robust quality controls are embedded throughout the end-to-end process to prevent deviations and increase the right-first-time yield.